Scheduled time period
Monday 31st March 2025 at 8:00pm to Saturday 5th April 2025 at 6:00pmReturn to full capacity expected Saturday, April 5th.
Planned Cygnus production reduction due to rig arrival and interfacing.
Unavailable Capacity
2.7mcm/d
Available Capacity
2mcm/d
Technical Capacity
4.7mcm/d