Impacted time period
Wednesday 2nd October 2024 at 4:43pm to Thursday 3rd October 2024 at 3:15pm2 Cavity operation only from Hill Top Gas Plant.
Failure of hydraulic control valve at HT10 Cavity.
Unavailable Capacity
0.3886TWh
Available Capacity
0.259TWh
Technical Capacity
0.6477TWh