Scheduled time period

Friday 31st May 2024 at 5:00pm to Friday 5th July 2024 at 10:30am

There will be a period of reduced rates either side of the shutdown as production ramps down and restarts.

Planned maintenance

Unavailable Capacity
5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5mcm/d
Further Information