Impacted time period
Saturday 9th September 2023 at 11:55am to Sunday 17th September 2023 at 3:30pmTrain 1 HIPPS
Failure
Unavailable Capacity
121.5GWh/d
Available Capacity
220.8GWh/d
Technical Capacity
342.3GWh/d