Scheduled time period
Friday 30th June 2023 at 5:00am to Saturday 1st July 2023 at 5:00amThere is no additional impact to gas injection through the Easington Terminal under this REMIT.
Injection REMIT This REMIT is to confirm CSL have undertaken work to increase the maximum injection rate into Rough and hence the quantity of gas which can be stored in a storage cycle. There is no additional impact to gas injection through the Easington Terminal under this REMIT.
Unavailable Capacity
0mcm/d
Available Capacity
8.6mcm/d
Technical Capacity
8.6mcm/d