Impacted time period
Tuesday 6th June 2023 at 9:45am to Wednesday 28th June 2023 at 9:00amReduction in max flow.
Failure
Unavailable Capacity
253.9GWh/d
Available Capacity
88.4GWh/d
Technical Capacity
342.3GWh/d