Scheduled time period
Saturday 25th February 2023 at 2:00am to Sunday 26th February 2023 at 6:00amPlanned offshore outage complete. Rates returning to previous levels.
Perenco Bacton reduced terminal throughput.
Unavailable Capacity
1.4mcm/d
Available Capacity
9.7mcm/d
Technical Capacity
11.1mcm/d