Impacted time period
Thursday 28th December 2017 at 6:00am to Friday 29th December 2017 at 6:00amOffshore production is back to normal levels (technical capacity). Elgin Franklin delivery to Bacton SEAL will slowly increase over the course of the day to normal levels.
This message only relates to Elgin Franklin, not all flow at Bacton SEAL
Unavailable Capacity
1.5mcm/d
Available Capacity
8.5mcm/d
Technical Capacity
10mcm/d