This is not the latest revision of this event. Please click here to see the latest update.

Scheduled time period

Monday 1st August 2022 at 6:00am to Saturday 6th August 2022 at 6:00am

There will be a period of reduced rates either side of the shutdown as production ramps down and restarts

Planned maintenance

Unavailable Capacity
7mcm/d
Available Capacity
0mcm/d
Technical Capacity
7mcm/d